Ontario Transit Group (OTG) is a joint venture between Ferrovial Construction and Vinci Construction Grands Projets (through their subsidiary JANIN ATLAS) to design, build and deliver the Ontario Line Subway - Southern Civil, Stations and Tunnel work for Metrolinx and Infrastructure Ontario through the heart of downtown Toronto.
The Ontario Line - Southern Civils, Stations and Tunnels contract includes:
-
A six-kilometre subway tunnel and associated tunneling works from Exhibition Station to the Don Yard portal (west of the Don River).
-
Groundworks for construction of the tunnels and stations, including setting up utilities and conduits for the mechanical and electrical systems and preparation for the track structure to be installed.
-
Delivering 7 new and expanded subway stations:
-
One new above-ground station, integrated to the existing GO Transit Exhibition Station, south of Liberty Village.
-
Two underground stations, to be integrated with the existing TTC Osgoode and TTC Queen subway stations, and,
-
Four new underground subway stations (King-Bathurst, Queen-Spadina, Moss Park, Corktown).